So I'll move to my garage to build windows, hatch supports and water and waste systems over the winter.
There are few pictures of my boat up to now.
Waste tank support |
45 gallon tank dry fitted (starboard side) |
The same tank (but water) is gonna be installed on port side |
Cockpit (port) |
Cockpit (starboard) |
Deck (starboard) |
Starboard deck (bow view) |
Cabin |
Cabin from inside (port side) |
Cabin from inside (port side) |
Inside the starboard hull (view from bow) |
Inside the starboard hull (view from aft) |
Outer panel (starboard). Some taping is still required. |
No comments:
Post a Comment