Monday 12 November 2012

Current state of the project

Seems like the active work in shed is over for the season :(
So I'll move to my garage to build windows, hatch supports and water and waste systems over the winter.
There are few pictures of my boat up to now.

Waste tank support










45 gallon tank dry fitted
(starboard side)











The same tank (but water)
is gonna be installed on port side











Cockpit (port)










Cockpit (starboard)










Deck (starboard)










Starboard deck  (bow view)










Cabin










Cabin from inside (port side)










Cabin from inside (port side)










Inside the starboard hull
(view from bow)














Inside the starboard hull
(view from aft)














Outer panel (starboard).
Some taping is still required.

No comments:

Post a Comment